Project sheet

Name

Eficiência Energética em Edifícios da Administração Pública Central

Total project amount

4,95 million €

Amount paid

1,98 million €

Non-refundable funding

4,95 million €

Loan funding

0 €

Start date

01.01.2022

Expected end date

30.06.2026

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in central public administration buildings

Operation code

01/C13-i02/2021.P153

Summary

A presente candidatura, apresentada pela Instituto Superior de Agronomia da Universidade de Lisboa, tem como objetivo a intervenção no Edifício Herbário contemplando a implementação de medidas compatíveis com as tipologias de intervenção, de acordo com o previsto no ponto 6 do Aviso n.º 01/C13-i02/2021. Assim, e de forma sintética, enumeram-se abaixo as medidas que se pretendem submeter a apoio, no âmbito da presente candidatura e que se encontram devidamente identificados no Relatório de Auditoria Energética e de Eficiência Hídrica do edifício (em anexo à presente candidatura): - MM1: Aplicação de isolamento térmico na cobertura (aplicação de 6 cm de isolamento térmico do tipo XPS na cobertura exterior, reduzindo os valores dos coeficientes de transmissão térmica associados); - MM2: Substituição da caixilharia existente por caixilharia em alumínio com corte térmico e vidro duplo com classificação mínima de A; - MM3: Substituição dos atuais equipamentos de aquecimento/arrefecimento ambiente por sistemas de expansão direta do tipo VRF; - MM4: Instalação de sistema solar fotovoltaico para produção de energia destinada a autoconsumo; - MM5: Instalação de um sistema de monitorização e gestão remota dos consumos de água do edifício; - MM6: Otimização dos dispositivos de água (As soluções consideradas são devidamente certificadas com classificação A ou superior de acordo com a ANQIP). Estão ainda abrangidas pela presente operação, as seguintes medidas, integradas na tipologia de intervenção 5: - MM7: Auditoria energética e emissão de Certificado Energético (CE) ex-ante no âmbito do SCE; - MM8: Auditoria energética e emissão de Certificado Energético (CE) ex-post no âmbito do SCE; - MM9: Plano de comunicação e de sensibilização aos utilizadores do edifício. A candidatura apresenta uma redução estimada de energia primária de 9,46 tep/ano (54,51%) e uma redução das emissões de Gases com Efeito de Estufa (GEE) de 11,00 tCO2 eq/ano.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,9
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

4,95 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 40 %,

Where was the money spent

By county

1 county financed .

  • Leiria 4,95 million € ,
Source EMRP
09.03.2026