Eficiência Energética em Edifícios da Administração Pública Central
Project sheet
Name
Eficiência Energética em Edifícios da Administração Pública CentralTotal project amount
431,37 thousand €Amount paid
172,55 thousand €Non-refundable funding
431,37 thousand €Loan funding
0 €Start date
19.01.2023Expected end date
31.03.2026Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in central public administration buildingsOperation code
01/C13-i02/2021.P9Summary
O objetivo da operação é alcançar a melhoria da eficiência energética do Campus do IPP, através de um conjunto de investimentos em diferentes tipologias de intervenção. A operação irá incidir no edifício do Campus que serve a Escola Superior de Tecnologia e Gestão (ESTG) e a Escola Superior de Saúde (ESS). Este edifício apresenta algumas lacunas a nível energético, o que se reflete no consumo de energia e consequentemente de emissões de CO2, conforme se comprova pelo certificado energético emitido, que revela que o edifício pertence à classe energética C, apresentado consumos na ordem dos 691,981 kWh/ano, o que corresponde a 172,5 ton/ano de emissões de CO2. Assim, nesta operação estão previstos os seguintes investimentos: Instalações de AVAC - Climatização; Instalação de central fotovoltaica; Instalação de sistema de gestão de energia para controlar os consumos; Substituição das lâmpadas atuais por lâmpadas LED; Certificação Energética ex-ante e ex-post. Consultoria em eficiência energética Com este conjunto de investimentos pretende-se reduzir o consumo energético de eletricidade e gás em 232.380 kWh/ano, adotando em alternativa a energia solar. Espera-se assim alcançar uma redução de 46,6% do consumo de energia primária e uma redução de 41,47% de emissões de CO2.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
431,37 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 40 %,Where was the money spent
By county
1 county financed .
-
Viana do Castelo 431,37 thousand € ,