Instalação de sistema de produção de energia elétrica por painéis fotovoltaicos com armazenamento por baterias nasTotal project amount
38,43 thousand €Amount paid
19,87 thousand €Non-refundable funding
38,43 thousand €Loan funding
0 €Start date
30.06.2022Expected end date
30.11.2022Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P20Summary
Pretende-se instalar um sistema de produção de energia solar com recurso a painéis fotovoltaicos e sistema de baterias para acumulação de excesso de produção durante o dia. A Instalação será dimensionada para atingir o objetivo de suprir até 100 % das necessidades diárias de consumo (em 24 horas), tendo como objetivo mínimo alcançar 80 %, e em fases sucessivas aumentar a capacidade de produção para permitir suportar primeiro 100% das necessidades diárias no período invernal e depois suportar o carregamento de pelo menos duas viaturas elétricas. Será instalado um sistema de gestão centralizada da energia, que permita em tempo real avaliar o consumo total, e identificar situações passíveis de racionalização e de intervenção no sentido da redução dos consumos. Para isso serão instalados 36 módulos solares novos, e convertidos 16 de microgeração para autoconsumo, instalado o sistemas de baterias adequado ao excesso de produção previsto, e numa segunda fase ampliado o sistema até cumprir o objetivo de 100% das necessidades de consumo com 2 viaturas elétricas incluídas.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
38,43 thousand €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 51,7 %,Where was the money spent
By county
1 county financed .
-
Torres Vedras 38,43 thousand € ,