Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

na

Total project amount

49,7 thousand €

Amount paid

31,4 thousand €

Non-refundable funding

49,7 thousand €

Loan funding

0 €

Start date

01.04.2022

Expected end date

31.03.2023

Dimension

Climate Transition

Component

Energy efficiency in buildings

Investment

Energy efficiency in buildings used by the service sector

Operation code

01/C13-i03/2022.P327

Summary

"A aposta na eficiência energética dos edifícios é uma prioridade para a SESC Sociedade de Estudos Superiores e Culturais S.A. designadamente, ao nível da melhoria dos níveis de extensão da vida útil dos edifícios, do aumento do seu conforto térmico, da redução da fatura e da dependência energética da empresa, bem como a redução de emissões de gases com efeito de estufa (GEE).O presente projeto de investimento assume como objetivo a adoção de medidas que fomentem a eficiência energética e que reforcem a produção de energia de fontes renováveis em regime de autoconsumo, contribuindo para a melhoria do desempenho energético e ambiental de um dos edifícios onde a SESC Sociedade de Estudos Superiores e Culturais S.A. está instalada (Edificio Erisa).Em concreto, pretende-se que as medidas a apoiar conduzam a 62,6% de redução do consumo de energia primária no edifício intervencionado, por via de aposta em três medidas críticas:1 - Substituição Iluminação por luminárias de Led. A medida consiste na alteração da iluminação da seguinte forma: substituição de iluminação do tipo fluorescentes tubulares por led, substituição de iluminação do tipo fluorescentes compactas por led e substituição de iluminação do tipo halogénio por led. A iluminação será realizada com luminárias equipadas com lâmpadas de alto rendimento, nomeadamente LED´s, recorrendo a diversos tipos de luminárias de acordo com os níveis de iluminação pretendidos. O sistema de iluminação será interligado á gestão sendo introduzido sistema sensores de movimento (sensor micro-ondas ST71E).2 - Instalação de Painéis fotovoltaicos. O edifício será dotado de painéis fotovoltaicos para produção de energia elétrica para autoconsumo. O sistema de produção de energia elétrica é constituído por 74 painéis fotovoltaicos de 540Wp, da marca Jasolar, JAM72S30 540W. A produção para autoconsumo prevista destes painéis será de 54 627kWh/ano, de acordo com o relatório SCE.ER da DGEG.3 - Auditorias energéticas e emissão de Certificado Energético ex-ante e ex-post, no âmbito do SCE, bem como ações de consultoria em eficiência energética, fundamentais à execução das medidas. "

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,7
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

49,7 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 63,2 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 49,7 thousand € ,
Source EMRP
09.03.2026
All themes
Transparency without leading