PRR Project
Candidatura - Desempenho Energético de Edifícios
Project sheet
Name
Candidatura - Desempenho Energético de EdifíciosTotal project amount
31,5 thousand €Amount paid
0 €Non-refundable funding
31,5 thousand €Loan funding
0 €Start date
01.10.2022Expected end date
31.10.2022Dimension
Climate TransitionComponent
Energy efficiency in buildingsInvestment
Energy efficiency in buildings used by the service sectorOperation code
01/C13-i03/2022.P462Summary
"Pretende-se instalar um sistema fotovoltaico ligado à rede, constituído por 60 módulos Trina 505 (144,6 m²) mais 33 módulos QCells455 (73,5 m²) ambos com inclinação 10° e orientação 0°. Potência nominal da instalação 45,32 kW; módulos organizados em 6 fileiras (strings). A tensão máxima é 258 V. Degradação máxima do rendimento dos módulos: 0,6% por ano (informação não utilizada em cálculos). Perdas ambientais: 0,5% por variação espectral, 0,5% por deposição de poeiras e sujidades sobre os módulos. Sem baterias. Sistema explorado em regime de autoconsumo. Prevê-se a instalação de 2 inversores com potências de 30kWp para uma futura ampliação. Prevê-se uma produção de 62.262 kwh/ano. Prevê-se uma poupança de 12452.4¬ /ano na fatura de energia elétrica. Conclui-se que esta medida de melhoria altera a classe energética da fração e conseguem-se alcançar poupanças, com retorno, do investimento em menos de quatro anos. "
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
31,5 thousand €
Total amount of the project
Where was the money spent
By county
1 county financed .
-
Ourém 31,5 thousand € ,