Project sheet

Name

LOJA SOCIAL DE ESPOSENDE – INSTALAÇÃO DE ELEVADOR

Total project amount

13 thousand €

Amount paid

3,9 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.10.2024

Expected end date

31.12.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4579

Summary

No âmbito desta intervenção, pretende-se a instalação de um ascensor com capacidade de 680kg, com cabine interior com dimensões livres de 1.10x1.40m, e demais características de forma a dar cumprimento ao especificado nas Normas Técnicas de Acessibilidade anexas ao decreto-lei supra referido (secção 2.6 do Capítulo 2 do Anexo ao Decreto-Lei n.º 163/2009), designadamente:? Cabine interior com dimensões livres de 1.10x1.40m;? Cabine com barra de apoio colocada numa das paredes laterais da cabine, a uma cota compreendida entre 0.035m e 0.05m;? Cabine com precisão de paragem relativamente ao nível do piso do patamar não superior a 2cm;? Existência de espaço entre os patamares e o piso da cabine não superior a 3.5 cm;? Portas com largura útil mínima de 80cm (medida entre a face da folha da porta quando aberta e o batente ou guarnição do lado oposto);? Existência de cortina de luz standard (com feixe plano) que imobilize as portas e o andamento da cabine;? Dispositivos de comano instalados a uma altura, medida entre o piso e o eixo do botão, compreendida entre 0.90m e 1.2m, quando localizados nos patamares, e entre 0.90m e 1.30m quando localizados no interior das cabinas;? Dispositivos de comando com sinais visuais que indicam quando o comando é registado;? Dispositivos de comando com botão de alarme e outro de paragem de emergência localizados no interior da cabine.O elevador será instalado no sítio do monta-cargas, sendo necessário efetuar um conjunto de trabalhos prévios de construção civil para adaptação do espaço para conseguir proceder à sua instalação. Estes trabalhos respeitam, por exemplo, à remoção do monta-cargas existente, demolições de lajes, paredes e pavimentos, adaptação de redes de infraestruturas, entre outros. A execução destes trabalhos será efetuada previamente à instalação do elevador, sendo assegurada pelo Município de Esposende, fora do âmbito da candidatura. Do mesmo modo, será também assegurada a execução prévia de outros trabalhos relativos à eliminação de barreiras arquitetónicas existentes, designadamente o rebaixamento de passeio exterior e a execução de rampa no acesso aos gabinetes, no Piso 2.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

75,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Esposende 13 thousand € ,
Source EMRP
09.03.2026