Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Núcleo Infância e Juventude de Mafra

Total project amount

11,58 thousand €

Amount paid

3,47 thousand €

Non-refundable funding

11,58 thousand €

Loan funding

0 €

Start date

10.04.2022

Expected end date

15.05.2022

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

04/C03-i02/2023.P4907

Summary

Este projeto prevê a instalação do Núcleo de Infância e Juventude de Mafra numa fração do piso 0 doedifício existente e serve de apoio à população é uma resposta social que pretende utilizar mecanismos einstrumentos de forma a reduzir as barreiras e adversidades existentes, melhorando a acessibilidade doedifício. Atualmente é garantido o acesso a esta fração através de uma rampa que se destinará ao acessodos técnicos, pelo que, em conjunto com a Câmara Municipal de Mafra, está em curso um estudo para umanova rampa de acesso ao edifício para os utilizadores, pelo lado Norte do mesmo, com comunicação diretacom a praça de caráter pedonal.No piso 1 existem espaços de utilização comum, como sala de reuniões, copa e I.S., que cumprem asNTAs, não se prevendo qualquer intervenção neste piso. No entanto é apresentado nas Peças Desenhadaspara compreensão do funcionamento do equipamento no seu todo, onde são identificados a cinza as áreasde utilização “privada” e que não está no âmbito do presente projeto. Atualmente este piso é acessívelatravés de um ascensor existente, como pelos percursos acessíveis através das zonas comuns,nomeadamente uma rampa de acesso exterior.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

11,58 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Mafra 11,58 thousand € ,
Source EMRP
09.03.2026
All themes
Transparency without leading