Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

EstágiAP XXI – NOVA

Total project amount

444,12 thousand €

Amount paid

216,52 thousand €

Non-refundable funding

444,12 thousand €

Loan funding

0 €

Start date

03.01.2023

Expected end date

31.12.2023

Dimension

Digital Transition

Component

Digital public administration

Investment

Empowering public administration to generate real public value

Operation code

04/C19-i07.05/2022.P382

Summary

O projeto “EstágiAP XXI – NOVA” proposto pela NOVA e incluído nesta candidatura faz parte deste plano estratégico e assume maior relevância sobretudo ao nível do desenvolvimento de competências de jovens com formação superior, permitindo um primeiro contacto com o mercado de trabalho onde os estagiários e a entidade empregadora beneficiam mutuamente de uma lógica de transmissão e renovação de conhecimento institucional e intergeracional. Esta candidatura enquadra-se nessa estratégia já em curso na NOVA, de aumento do nível de qualificações e de competências dos seus funcionários; com destaque para as competências digitais cada vez mais necessárias; de contínua transformação digital interna de sistemas, processos e operações e também de aspirar a uma excelência operacional, de modo a garantir que a NOVA executa a sua estratégia de promoção da empregabilidade com eficiência e eficácia.Neste enquadramento, este projeto prevê de acordo com as diversas áreas que se encontram definidas e de acordo com os perfis indicados em B4, ações específicas de formação prática em diversos contextos (área de Recursos Humanos, IT, Financeira, Controlo de Gestão, área Jurídica, Comunicação, serviços de apoio às áreas de ensino e investigação, ambiente laboratorial, etc.). Será dada aos técnicos superiores a possibilidade de desenvolverem atividades em diversas áreas da instituição de ensino superior e da investigação, dando-lhes a oportunidade de desempenharem as suas funções enquadrados em equipas dinâmicas, num ambiente universitário, de contínua aprendizagem e formação.Estas ações serão potenciadas, ainda, pela maior capacitação, por via da crescente digitalização e inovação dos seus processos e procedimentos e da sua relação com todos os parceiros, garantindo uma Universidade NOVA mais próxima.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

13,4
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

444,12 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 48,8 %,

Where was the money spent

By county

1 county financed .

  • Lisboa 444,12 thousand € ,
Source EMRP