Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

UCCI ANCOR - VILA PRAIA DE ÂNCORA - CAMINHA

Total project amount

840 thousand €

Amount paid

109,2 thousand €

Non-refundable funding

840 thousand €

Loan funding

0 €

Start date

01.05.2021

Expected end date

31.10.2024

Dimension

Resilience

Component

National Health Service

Investment

National Integrated Continued Care

Operation code

06/C01-i02/2023.P5796

Summary

A memória descritiva anexa a esta candidatura descreve de forma exaustiva o programa funcional e técnico desta infraestrutura. O projeto encontra-se numa fase avançada da sua execução estando prevista a sua conclusão no final de outubro de 2024.O valor do investimento total (200 camas) ascende a 11.145.334 euros conforme também mapas detalhados remetidos em anexo.O valor de edifícios e outras construções relativo á UCCI ascende a 6.747.201 euros tendo-se utilizado como pressuposto base de afetação o peso relativo do número de camas UCCI no total de camas. Relativamente aos equipamentos (mobiliário, etc.) considerou-se um custo médio por cama UCCI de 3.255 euros (detalhe em anexo). Reportando-nos exclusivamente ao valor de investimento das camas a concurso (total das 3 candidaturas) o valor total de investimento ascende a 4.273.227 euros. Considerando o disposto quanto ao limite de despesa na rubrica de Edifícios e outras construções (70% do total do investimento) o valor elegível ajustado é de 3.583.145 euros (detalhe em anexo).Nota: por razões de limitação de upload, os ficehrios relativos oa projeto de arquitetura encontra-se divididos pelos ficheiros zip incluidos na página Anexos

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

840 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 13 %,

Where was the money spent

By county

1 county financed .

  • Caminha 840 thousand € ,
Source EMRP
09.03.2026
All themes