PRR Project
EAEA - Equipamento de Apoio ao Envelhecimento Ativo
Project sheet
Name
EAEA - Equipamento de Apoio ao Envelhecimento AtivoTotal project amount
12,54 million €Amount paid
2,9 million €Non-refundable funding
12,54 million €Loan funding
0 €Start date
30.09.2023Expected end date
30.06.2026Dimension
ResilienceComponent
Social InterventionInvestment
Reinforcing Social Intervention in the Autonomous Region of Madeira (ARM)Operation code
06/C03-i03-RAM/2023.P4457Summary
A estrutura residencial com capacidade para 120 camas (em que 20% dos quartos são individuais), destina-se a pessoas com mais de 65 anos, que por razões familiares, dependência, isolamento, solidão ou insegurança não podem permanecer na sua residência. Este estabelecimento procura proporcionar serviços permanentes e adequados à problemática biopsicossocial das pessoas idosas, contribuir para a estimulação de um processo de envelhecimento ativo, criar condições que permitam preservar e incentivar a relação intrafamiliar e a integração social através de atividades e serviços designadamente: Alimentaçãoadequada às necessidades, cuidados de higiene pessoal, tratamento de roupa, atividades de animação sociocultural, lúdico-recreativas e ocupacionais, cuidados de enfermagem e acesso a cuidados de saúde. Permitir a convivência social, a participação dos familiares e amigos e ainda assistência religiosa sempre que o residente o solicite.
Beneficiaries
The two types are::
- Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
- Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.
Call for applications
As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.
The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.
Final evaluation score
The components for calculating the assessment score can be found in the selection criteria document mentioned below.
Selection criteria
Beneficiaries
Intermediate beneficiaries
Procurement
Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.
To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.
Geographic distribution
12,54 million €
Total amount of the project
Percentage of the amount already paid for implementing projects
, 23,1 %,Where was the money spent
By county
1 county financed .
-
Câmara de Lobos 12,54 million € ,