Name

Melhoria da Acessibilidade – Cemitério Paroquial da Senhora da Hora

Total project amount

13 thousand €

Amount paid

6,5 thousand €

Non-refundable funding

13 thousand €

Loan funding

0 €

Start date

01.05.2025

Expected end date

31.08.2025

Dimension

Resilience

Component

Social Intervention

Investment

360° Accessibility

Operation code

11/C03-i02/2025.P16420

Summary

Propõe-se a demarcação adequada do estacionamento para Pessoa com Mobilidade Condicionada (PMC), conforme a Secção 2.8 das NTA, posicionando-o paralelo à via e garantindo dimensões de 5,0x2,5m, acrescidas de faixa lateral de 1,0m. A marcação incluirá pintura contrastante e símbolo internacional de acessibilidade. Será criada uma rampa com inclinação de 6%, devidamente sinalizada, garantindo acesso entre o estacionamento e a entrada principal do cemitério, sem barreiras arquitetônicas. O pavimento degradado será substituído por granito semelhante ao existente, mas com superfície regular, conforme a Secção 2.7 das NTA. Será eliminado o ressalto entre o piso externo e o patamar de acesso à instalação sanitária (I.S.), que será adaptada para PMC. Para ampliar o acesso, propõe-se a demolição da floreira que delimita o patamar, garantindo largura mínima de 1,20m, com instalação de guarda metálica para segurança junto à escada. A I.S. utilizada por funcionários permanecerá reservada, enquanto a outra será reformulada para acessibilidade, conforme a Secção 2.9 das NTA. Isso inclui demolição de divisórias, ampliação do vão da porta, instalação de porta pivotante de vidro e espaço para manobra de cadeira de rodas. A nova I.S. acessível terá lavatório, sanita e urinol, com barras de apoio, sistema de alarme e sinalização. Os revestimentos de pisos e paredes serão substituídos, com criação de teto falso para iluminação e ocultação de marcas da reforma. A porta de vidro laminado terá película fosca para luz natural e privacidade, incluindo sinalética acessível.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

70,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

13 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 50 %,

Where was the money spent

By county

1 county financed .

  • Matosinhos 13 thousand € ,
Source EMRP