Project sheet

Name

Requalificação do Centro de Saúde de Penacova

Total project amount

988,38 thousand €

Amount paid

225 thousand €

Non-refundable funding

988,38 thousand €

Loan funding

0 €

Start date

07.09.2022

Expected end date

31.12.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

12/C01-i01/2022.P2573

Summary

No âmbito deste projeto serão implementadas as ações que se descrevem de seguida com a respetiva estimativa orçamental (EO):• Elaboração de projetos – EO: 19.990,00€• Colocação de isolamento térmico na cobertura plana - implementação de solução de impermeabilização e isolamento térmico em cobertura invertida – EO: 170.463,58 €;• Aplicação de Sistema de Isolamento Térmico pelo Exterior (ETICS), na face exterior das fachadas. É de notar que, devido ao consequente aumento de espessura das paredes de fachada, deverão ser sobrepostas chapas (com pingadeiras) nos peitoris dos vãos, que permitam a drenagem dos peitoris em toda a espessura da parede, e deverão, também, ser feitas as adaptações necessárias aos tubos de queda – EO: 157.537,16 €;• Substituição de caixilharias existentes, por caixilharias com corte térmico e vidro duplo, incluindo colocação de isolamento térmico nas caixas de estores – EO: 157.273,20 €;• Colocação de isolamento térmico nas lajes de pavimento em contacto com o exterior, incluindo solução de revestimento para proteção do isolamento (nos corpos sul e oeste) – EO: 160.463,58 €• Serão revistos os sistemas de climatização, ventilação e de extração de ar das instalações sanitárias tendo como finalidade melhorar a eficiência energética, através da instalação de equipamentos de última geração, mas também promover a melhoria da qualidade do ar interior – EO: 34.462.86 €;• Substituição das luminárias existentes por luminárias LED e implementação de dispositivos de controlo (sensores de presença/luminosidade) – EO: 87.699.60 €;• Instalação de um sistema solar fotovoltaico para produção de energia elétrica para autoconsumo o que vai permitir uma redução da dependência de energia com origem fóssil da instalação, tendo este ainda impacto direto na redução dos encargos com a compra de energia elétrica à rede pública de distribuição – EO: 16.306,39 €;• Melhoria das acessibilidades, nomeadamente através da criação de uma Instalação sanitária acessível, do alargamento de vãos de portas e da instalação de plataforma elevatória para acesso ao piso 3 – EO: 50.000,00 €.• Fiscalização – 45.803,72 €.Refira-se que esta empreitada contempla um conjunto de intervenções de construção civil transversais necessárias à implementação das várias ações.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

988,38 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 22,8 %,

Where was the money spent

By county

1 county financed .

  • Penacova 988,38 thousand € ,
Source EMRP
09.03.2026