Name

Veículo Elétrico de 9 lugares com Transformação

Total project amount

40 thousand €

Amount paid

28 thousand €

Non-refundable funding

40 thousand €

Loan funding

0 €

Start date

24.07.2025

Expected end date

30.03.2026

Dimension

Resilience

Component

Social Intervention

Investment

New Generation of Equipment and Social Intervention

Operation code

12/C03-i01/2024.PPRR-RE-C03-i01-12-000766

Summary

Com a presente Operação pretende-se adquirir uma viatuar de 9 lugares com transformação, nomeadamente , com 9 lugares ou 6 mais 1 em cadeira de rodas, com os requisitos 12 12 15 (Auxiliares de elevação de pessoas para o carro - excluindo cadeira de rodas), 12 12 18 (Auxiliares de elevação para pessoa sentada na sua cadeira de rodas para o interior do carro) e 12 12 24 (Equipamento para fixar a cadeira de rodas ao carro) , 100% elétrica. Com o transporte adaptado a pessoas com mobilidade reduzida pretende-se contribuir para mitigar as necessidades da instituição ao nivel do transporte dos beneficiários que frequentam as respostas sociais de CACI e Lar Residencial; melhorar a qualidade de vida das pessoas com deficiência, num concelho maioritáriamente rural , sem outras respostas que apoiem pessoas com deficiência e muito deficitária ao nível da rede de transportes, especialmente para pessoas com mobilidade reduzida; Suprir as preocupações ambientais inerentes ao elevado número de quilómetros (aproximadamente 300 km diários) que a instituição faz com veículos a diesel , para assegurar o acesso e participação nas actividades desenvolvidas pela instituição; Colmatar a falta de viaturas diretamente relacionada com os projetos já em execução nomeadamente: construção de uma unidade de CACI para apoiar mais 30 beneficiários; o alargamento do edificio de Lar destinado a mais 6 residentes ; e a implementação de duas RAI para mais 10 pessoas com deficiência.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

80,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

40 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 70 %,

Where was the money spent

By county

1 county financed .

  • Macedo de Cavaleiros 40 thousand € ,
Source EMRP