Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Centro de Recursos para a Inclusão Social

Total project amount

50 thousand €

Amount paid

15 thousand €

Non-refundable funding

50 thousand €

Loan funding

0 €

Start date

01.12.2024

Expected end date

31.10.2025

Dimension

Resilience

Component

Social Intervention

Investment

Integrated operations in deprived communities in the Metropolitan Areas of Lisbon and Porto

Operation code

12/C03-i06.03/2024.P13492

Summary

O projeto "Centro de Recursos para a Inclusão Social (CRIS)”, realizado pelo Município de Valongo, foi concebido numa lógica de participação ativa de potenciais utilizadores/as do CRIS, através de entrevistas presenciais (realizadas no âmbito do Diagnóstico Social para a caracterização das Pessoas em Situação de Sem-Abrigo – PSSA, no concelho de Valongo (2024) (cf. Anexo)) que deram conta das necessidades, numa primeira fase, e à posteriori foram auscultadas quanto ao desenho do projeto, dando contributos muito pertinentes que foram devidamente considerados.Nesta lógica, o CRIS disponibiliza os seguintes serviços:Espaço de higiene pessoal (individual);Espaço de tratamento de roupa;Cabeleireiro/Barbearia;Acesso à correspondência;Armazenamento de bens e pertences;Espaço para animais de companhia.Os serviços acima elencados constituem uma resposta integrada, que promove a autonomia e ao mesmo tempo respeita a autodeterminação dos/as utilizadores/as.Assim, o espaço e os equipamentos disponibilizados são essenciais para o desenvolvimento da solução inovadora. Não obstante, a intervenção da equipa técnica é imprescindível para identificar e integrar pessoas em risco de exclusão social, capacitar os/as utilizadores/as para a o uso do espaço, promover a aquisição de uma rotina de higiene e autocuidados e avaliar e monitorizar as mudanças resultantes da participação no projeto.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,2
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

50 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 30 %,

Where was the money spent

By county

1 county financed .

  • Valongo 50 thousand € ,
Source EMRP
09.03.2026
All themes