Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Reabilitação do Centro de Saúde de Castanheira de Pera

Total project amount

55,35 thousand €

Amount paid

0 €

Non-refundable funding

55,35 thousand €

Loan funding

0 €

Start date

01.09.2024

Expected end date

31.07.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

14/C01-i01/2023.P4474

Summary

A operação urbanística a promover consiste numa série de intervenções tendentes à melhoria do desempenho energético do edifício, à melhoria das acessibilidades e à resolução de algumas patologias que edifício apresenta.• Reparação da cobertura (correção dos sistemas de drenagem: caleiras, tubos de queda, impermeabilizações…);• Reabilitação de fachadas;• Reparação dos danos no interior (paredes, tetos e pavimentos);• Projeto de alteração das instalações sanitárias de forma a cumprir o estipulado no DL 163/2006;• Implementação das medidas de autoproteção contra incêndios;• Eficiência energética: De acordo com o Certificado Energético realizado em julho do presente ano, o edifício do Centro de Saúde obteve a classificação D, a que corresponde: uma eficiência na utilização de energia, na ordem dos 181% em relação a valores de referência, e de emissões de CO2 de 41,9 ton/ano. O mesmo certificado, aponta um conjunto de medidas de correção que a ser implementadas, alterariam a classificação para A+, prevendo-se uma poupança em custos com energia na ordem dos 36.000€/ano e que consistem no seguinte:o Fachadas: Aplicação de isolamento térmico pelo exterior;o Coberturas: Aplicação de isolamento térmico sob/ sobre a laje de esteira;o Substituição de vãos existentes por outros mais eficientes (caixilharia e vidros);o Substituição do sistema existente de climatização (sistema de aquecimento a gás) e renovação de ar, por outro mais eficiente (bomba de calor), incluindo equipamento de monitorização e controlo centralizado;o Instalação de painéis fotovoltaicos dimensionados em função do novo sistema de climatização e de forma a alimentar também os aparelhos de iluminação e outros equipamentos existentes;o Substituição de luminárias existentes, por luminárias de tecnologia LED.O valor estimado do investimento é de 550955.00 €, acrescido de IVA.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

55,35 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Castanheira de Pêra 55,35 thousand € ,
Source EMRP
09.03.2026