Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

eACADEMIC+ Digitalização da Gestão Académica

Total project amount

35 thousand €

Amount paid

0 €

Non-refundable funding

35 thousand €

Loan funding

0 €

Start date

01.02.2026

Expected end date

30.06.2026

Dimension

Digital Transition

Component

Digital public administration

Investment

Redesigning public and consular services

Operation code

155/C19-i01.01/2025.P29075

Summary

A presente operação visa a integração da Plataforma de Pagamentos da Administração Pública (PPAP) e da Plataforma de Mensagens da Administração Pública (GAP) no sistema de gestão académica do Instituto Politécnico de Santarém, promovendo a modernização digital, a eficiência operacional e o reforço da comunicação com os estudantes, de acordo com as prioridades do Aviso N.º 155/C19-i01/2025.A adesão a estas duas plataformas permite:Melhorar os processos de contacto com os utilizadores, através de SMS informativos e transacionais;Desmaterializar e automatizar os procedimentos de pagamento, através de meios eletrónicos (MB WAY, cartões, referências online);Promover a simplificação administrativa, alinhada com os princípios do SIMPLEX;Assegurar a interoperabilidade tecnológica, em conformidade com a Estratégia Digital Nacional e com o modelo “Mosaico".A integração do CUSP não é abrangida nesta operação, por já existirem sistemas consolidados de gestão académica e canais digitais eficazes de interação com a comunidade académica, evitando redundância de sistemas e complexidade adicional. Assim, a candidatura concentra-se especificamente na GAP e PPAP, as quais apresentam impacto operacional direto, elevada aplicabilidade e benefícios tangíveis na eficiência dos serviços.A operação será executada de forma faseada (análise técnica, desenvolvimento, testes e implementação), garantindo sustentabilidade tecnológica, utilização efetiva dos serviços digitais e reforço da capacidade de atendimento e gestão da informação no IPSantarém.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

3,8
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

35 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Santarém 35 thousand € ,
Source EMRP
09.03.2026
All themes
Transparency without leading