Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Beneficiação do Centro de Saúde de Freixo

Total project amount

266,26 thousand €

Amount paid

51,5 thousand €

Non-refundable funding

266,26 thousand €

Loan funding

0 €

Start date

01.10.2024

Expected end date

31.12.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P10451

Summary

Freixo, com vista a melhorar a eficiência energética do edifício, bem como, conferir condições condignas de trabalho aos colaboradores e utentes. Serão feitas intervenções ao nível do Sistema de AQS com bomba de calor, reabilitação de fachadas e cobertura e climatização eficiente, mais especificamente, as ações visam o seguinte: • Aumentar a eficiência energética do Centro de Saúde de Freixo, pertencente à Unidade Local de Saúde do Alto Minho, EPE.• Eliminar o consumo de Gás (GPL), relativo ao sistema de acumulação de água quente sanitária e alimentação de água quente às UTAS, provenientes de caldeira a Gás• Reabilitação das fachadas revestidas com ETICS e da cobertura• As ações a desenvolver terão em conta as necessidades locais, a utilização de tecnologias e boas práticas no âmbito da eficiência energética e a utilização sustentável dos materiais e recursos naturais.Sendo Centro de Saúde de Freixo, pertence à Unidade Local de Saúde do Alto Minho, EPE, a intervenção infraestrutural será promovida pelo Município de Ponte de Lima ao abrigo do Contrato Interadministrativo de colaboração a celebrado entre a CIM Alto Minho, os Municípios e a Unidade Local Saúde Alto Minho (ULSAM).

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

266,26 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 19,3 %,

Where was the money spent

By county

1 county financed .

  • Ponte de Lima 266,26 thousand € ,
Source EMRP
09.03.2026
All themes
Transparency without leading