Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Remodelação do Centro de Saúde de Góis

Total project amount

930 thousand €

Amount paid

0 €

Non-refundable funding

930 thousand €

Loan funding

0 €

Start date

30.01.2024

Expected end date

31.12.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P10470

Summary

C1 - Trabalhos de empreitadas de Obras Públicas para o cumprimento de critérios de eficiência energética, de acordo com a Recomendação (EU) 2019/786 da Comissão sobre renovação dos edifícios ou DL n.º 101-D/2020, de 07/12 na sua actual redação.Encargos com publicitação do financiamento ao abrigo do PRR, no local das obras de requalificação e após a conclusão das mesmas, no próprio edifício. Custo padrão – 800.00€/m2.Área Bruta edifício --- 665m2 Área lavandaria, etc. – 85m2 Área total = 750m2C1 – 750m2 * 800,00€/m2 = 600.000,00€C2 - Arranjos exteriores dentro do perímetro do estabelecimento necessários às soluções de acessibilidades - até ao limite de 10% do custo total de construção financiado C2 - 0.10 * C1 =60.000,00€ C3 - Estudos, projetos, atividades preparatórias e assessorias diretamente ligados à operação - até ao limite de 5 % do custo total de construção financiadoC3 – 0.05* C1 = 30.000,00€C4 - Coordenação e gestão do projeto, fiscalização, coordenação de segurança e assistência técnica - ao limite de 5 % do custo total de construção financiadoC4 – 0.05* C1 = 30.000,00€C5 - Revisões de preços ao contrato decorrentes da legislação aplicável - até ao limite de 5 % do custo total de construção financiadoC5 – 0.05*C1 = 30.000,00€C6 - Aquisição de equipamentos de saúde no âmbito dos cuidados de saúde primários:- Equipamento básico /clínico- Equipamento administrativo (incluindo mobiliário)- Equipamento informático e de comunicaçãoC6 – estimativa em função da listagem fornecida pelo Centro de Saúde – 40.000,00€CUSTO TOTAL = 790.000,00€ + iva

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

930 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Góis 930 thousand € ,