Project sheet

Name

Requalificação da Extensão de Saúde da Teixeira

Total project amount

48,15 thousand €

Amount paid

12,04 thousand €

Non-refundable funding

48,15 thousand €

Loan funding

0 €

Start date

01.09.2024

Expected end date

30.06.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P10667

Summary

Esta intervenção assenta num pilar fundamental, a requalificação dos edifícios existentes e que se encontram degradados devido a anomalias e patologias da construção, e que concorrem para as reformas do PRR.No que respeita à requalificação teremos as seguintes intervenções:A cobertura, será intervencionada, pois trata-se de um local que apresenta diversas patologias e material de construção já em estado degradado, sendo removida a cobertura existente e aplicação de nova telha e estrutura de apoio, aplicação de novos rufos e novos tubos de queda. Uma vez que existem diversos sinais de humidade no edifício, previu-se fazer a impermeabilização das paredes exteriores, com aplicação de impermeabilizante para granito, vedação das juntas das pedras com cola veda e execução de rede guiada de águas pluviais. As cornijas serão intervencionadas, com um novo revestimento capôto em sistema de isolamento térmico pelo exterior (ETICS) composto por placas de poliestireno expandido (EPS 100), com 20kg/m3 de densidade e dimensões de 1000x500 (mm) e 60mm de espessura.As diversas redes prediais serão revistas, substituindo-se o que não esteja em funcionamento de acordo com indicações da Fiscalização.Reparação de uma tijoleira partida em pavimentos interiores, é também outra das intervenções que se preveem, assim como a aplicação de tetos falsos naos sanitários e na copa, devido ao facto dos existentes se apresentarem danificados devido à entrada de humidades. As caixilharias serão alvo de um tratamento geral, com a substituição de elementos danificados de acordo com indicações da Fiscalização.É importante referir, que durante a execução dos trabalhos, deverão ser tomadas todas as precauções necessárias com as redes de intrusão e segurança contra incêndios do edifício, que se encontram em prefeito funcionamento, sendo que após a conclusão dos trabalhos serão feitos ensaios para verificação das mesmas com as entidades responsáveis pela sua manutenção a cargo do Adjudicatário. Também durante a execução dos trabalhos o Centro de Saúde estará em funcionamento, devendo o Adjudicatário ter em atenção esse facto, gerindo as fases de obra, isto é, intervencionar por zonas disponibilizando outras para o regular funcionamento do Centro de Saúde, tendo em atenção a segurança das pessoas que lá trabalham e dos utentes.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

48,15 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Baião 48,15 thousand € ,
Source EMRP
09.03.2026