Information portal on various topics of management of public resources of the Portuguese State

Project sheet

Name

Conservação e Beneficiação da Cobertura da Unidade de Saúde de São Bartolomeu de Messines

Total project amount

40 thousand €

Amount paid

0 €

Non-refundable funding

40 thousand €

Loan funding

0 €

Start date

01.01.2025

Expected end date

30.04.2025

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

16/C01-i01/2023.P8885

Summary

Os centros de saúde a intervencionar já apresentam alguma decadência e desgaste face ao seu ano de construção já se ter dado no inicio do século.São visíveis o deficiente estado de conservação dos edifícios, necessitando, como tal, de obras no que diz respeito aos espaços existentes, já que, nos últimos anos, existe o surgimento de humidades, bolores, infiltrações e fissuras.De ressalvar que, hoje em dia, existem centros de saúde, que não cumprem integralmente a atual legislação no que diz respeito a pessoas com mobilidade condicionadas e segurança contra riscos de incêndio.O principal objetivo da candidatura em questão prende-se com o melhoramento da sustentabilidade ambiental e da certificação energética. Assim, o projeto a desenvolver deve ter em consideração a escolha das melhores soluções técnicas a nível ambiental e de eficiência energética, e, como tal, que se possa traduzir em poupanças futuras.Como tal pretende-se a realização de um conjunto de trabalhos de conservação e beneficiação da cobertura do edifico. Assim, entre as soluções propostas pretende-se: 1. Escoamento das águas da cobertura plana e da cobertura inclinada da unidade de saúde;2. Instalação de um novo tubo de queda e pingadeira para facilitar a drenagem das águas pluviais na cobertura plana;Existe a necessidade de limpeza das caleiras da cobertura inclinada, garantindo que o espaço para limpeza das caleiras não é inferior a 13cm.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

40 thousand €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Silves 40 thousand € ,
Source EMRP
09.03.2026
All themes
Transparency without leading