Name

Unidade de Saúde Familiar Levante - Pólo de Monte Gordo

Total project amount

191,88 thousand €

Amount paid

47,97 thousand €

Non-refundable funding

191,88 thousand €

Loan funding

0 €

Start date

01.02.2023

Expected end date

31.12.2024

Dimension

Resilience

Component

National Health Service

Investment

Primary Health Care with greater responsiveness rates

Operation code

17/C01-i01/2023.P10767

Summary

O Projeto de Ampliação da Unidade de Saúde de Monte Gordo envolve diferentes rúbricas de trabalho, apresentadas tanto no Estudo Prévio como na Estimativa Orçamental. Pode-se então afirmar que está previsto um investimento para o Estaleiro/Segurança e Saúde. Já na rúbrica de arquitetura propriamente dita, serão feitas demolições, alvenarias, revestimento de pavimentos, revestimento de paredes, revestimentos e impermeabilizações, serralharias/caixilharias, carpintarias/vão interiores/portas, equipamento, pinturas e arranjos exteriores. Para a rede de abastecimento de água serão feitas tubagens e acessórios, ligações e outros trabalhos e para a rede de drenagem e de águas residuais domésticas. Depois, as instalações elétricas são das rúbricas mais dispendiosas, uma vez que além dos alimentadores e quadros, cabos, iluminação e tomadas prevê-se igualmente a montagem de um sistema fotovoltaico. A transição digital é também considerada com as telecomunicações e o sistema automático de controlo de intrusão. O AVAC revela-se também uma das principais preocupações neste projeto uma vez que os trabalhos e equipamentos envolvidos têm como objetivo atenuar os gastos energéticos do edifício. Foi igualmente calculada a segurança contra incêndios. Importa referir, por fim, que a realização do Estudo Prévio, da Estimativa Orçamental e das Peças Desenhadas são fruto de uma prestação de serviços no valor de 7.950,00€ + IVA. Todos os custos referentes aos investimentos acima referidos do projeto estão definidos no valores do Contrato anexo.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

2,5
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

191,88 thousand €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 25 %,

Where was the money spent

By county

1 county financed .

  • Vila Real de Santo António 191,88 thousand € ,
Source EMRP
09.03.2026