Name

Construção da Loja do Cidadão de Lousada

Total project amount

1,71 million €

Amount paid

0 €

Non-refundable funding

1,71 million €

Loan funding

0 €

Start date

01.07.2024

Expected end date

30.06.2026

Dimension

Digital Transition

Component

Digital public administration

Investment

Redesigning public and consular services

Operation code

85/C19-i01.01/2024.P10772

Summary

Com esta candidatura, o Município de Lousada, pretende a construção de um edifício de raiz com cerca de 1.000m2, para alocação do Espaço do Cidadão, bem como outras entidades interessadas.A construção da Loja de Cidadão 3.0, envolve diversos passos, desde o seu planeamento, execução e disponibilização dos serviços aos utentes.1. O planeamento, inicia-se com a identificação do local adequado, o levantamento das necessidades da população residente, de forma a disponibilizar serviços centralizados num mesmo edifício.2. O projeto de arquitetura, será desenvolvido de forma que incorpore design moderno, acessibilidade e eficiência energética.3. A introdução de tecnologia de ponta centrada no atendimento multicanal ao cidadão, surge através da implementação de sistemas de atendimento digital, quiosques interativos, soluções de autoatendimento e a integração de serviços online.4. Infraestruturas de suporte, através da instalação de redes de comunicação, sistemas de segurança, e acessibilidades para pessoas com mobilidade reduzida.5. A construção, será realizada, respeitando o projeto de arquitetura, garantindo qualidade na construção e conformidade com as regulamentações.6. A verificação da funcionalidade dos sistemas, será efetuada através da verificação e realização de ajustes necessários, conforme as necessidades verificadas.7. A última fase, dá-se com a inauguração da Loja de Cidadão ao público.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,1
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Intermediate beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

1,71 million €

Total amount of the project

Where was the money spent

By county

1 county financed .

  • Lousada 1,71 million € ,
Source EMRP
09.03.2026
All themes